DivisionDepartmentTender Ref. No.Tender Opening DateName Of Work
GuntakalElectrical TRD GTLTN-GE-Tr-12-2014-15. 27-04-2015 Guntakal Division- Provision of Anti-Climbing device in monkey prone area to stop climbing of monkeys to OHE mast/portals.
 
Document Available
GuntakalMechanical C&W GTLSCR/WCTN/Mech./C&W/GTL/2014-15/10 dt 25.03.2015 27-04-2015 OEM activity i.e. Mechanized cleaning and watering of coaches of train No.12797/98 Venkatadri express at Chittoor Railway Station for 2 years
 
Document Available
GuntakalMechanical C&W GTLSCR/WCTN/Mech./C&W/GTL/2014-15/10 dt 25.03.2015 27-04-2015 Housekeeping, Cleaning of toilets, bathrooms & other miscellaneous activities at ATC/GY and Wet cleaning of Toilets in GY Depot for 2 years
 
Document Available
GuntakalCommercial GTLG/C.441/Leasing of SLRs/AGCs/2014-15/3 27-04-2015 Leasing of Parcel space in SLRs/AGCs over Guntakal Division
 
Document Available
NandedSignal & Telecom dept. Nanded SCRN-SG-36-2014-15-TAWS-30 27-04-2015 Provision of alteration of Mid-section Interlocked LC gate circuit with train Approach warning system for 25 mid section Interlocked gate over NED division(LC-47, 53, 54, 55, 60, 65C, 77,97, 118, 120, 122A, 134A, 139, 150, 4, 17, 20, 11, 115, 144B, 165B, 2, 21, 67,74), Provision of dead approach locking of 60sec time delay for Spl,A,B1,B2 and C class(manned) mechanically operated lifting barrier & Train Approcah warning system for LC 121 between Parbhani - Pergaon Station over Nanded Division.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.01.Central.2015 27-04-2015 Gudur-Vijayawada-Visakhapatnam sec. Supply and stacking of sand & boulders for monsoon emergency reserve on wheels at Krishna canal & Vatlur stations in ADEN/Bapatla & Eluru sub-divisions.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.02.Central.2015 27-04-2015 Gudur-Vijayawada-Visakhapatnam section- Updating, reconciling, construction and certification of land plans and fixing land boundary stones in ADEN/ Bapatla & Eluru sub-divisions.
 
Document Available
VijayawadaSignal & Telecom BZAB/S&T/MT/06/2015-16 27-04-2015 Vijayawada Division- Signal & Telecom - Signal and Telecom arrangements in-connection with Godavari Pushakarams
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.04.South.2015 27-04-2015 SW.I: Provision of platform water taps at 10 stations (AXR, KJJ, TMC, KRV,SDM,TNR,SKM,SVPM,TTU&UPD) in Sr.DEN/South jurisdiction for MEA Deficiencies SW.II: Nellore- Repairs to toilets for computer reservation office, CBSR office at Nellore and L.C Gate No. 116,117&118 in SSE/W/NLR. SW. III: Vijayawada-Gudur Section - Gudur- Repairs to colony drain in south colony. SW. IV: KAPT - Repairs to bore well and pipe line in crew rest room in SSE/W/NLR Section.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.01.Bridges.2015 27-04-2015 SW-I: Gudur-Vijayawada section - Repairs to existing corroded, pitted, perforated cross Bracings, lateral bracings and gussets, Trolley and man refugees at Br. No. 282 Up & Down @ km. 141/23-142/1, 281 Down @ km 140/14-18 and 273 Up @ km 137/11-13 between Gudur and Manubolu stations. SW-II :Vijayawada-Gudur section - Replacement of corroded trolley /Man refugees with new Trolley/Man refugees on major Bridge Nos. 357 Down, 477 UP, 541 Down and 589 Down.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.02.Bridges.2015 27-04-2015 SW-I: Gudur - Vijayawada Section - Replacement of corroded/perforated intermediate cross girder, stringers, stools and all cracked angles connecting Cross girders and stringer from Span No.7 to 12 of Krishna Bridge - 3 East, span 12x89.30m Girders between Vijayawada-Krishna canal stations. SW-I-A) - Replacement of existing corroded/perforated bottom main Cross angles and stringer connecting lateral bracings and gussets with new galvanised members. SW-I-B) - Replacement of corroded/perforated cross-girders & stools and cracked stringer connecting angles. SW-II: Gudur-Vijayawada section - Providing protective guards on cross girders etc., on bridge nos. 606 Up & Down, 608 Up & Down and Krishna bridge 3 East for 2 spans.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.03.Bridges.2015 27-04-2015 Gudur - Vijayawada section - Repairs to existing corroded/perforated top lateral bracings and gussets of stringers from span no. 7 to 12 & bottom main cross bracings from span no. 1 to 12 and replacement of corroded wornout rivets duly replacing of corroded M.S Plates on cross girders from span no. 7 to 12 of bridge no. 3 West (Krishna Bridge) between Krishna canal - Vijayawada stations.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.02.North.2015 27-04-2015 Vijayawada Division: Vijayawada-Visakhapatnam section - Updating, reconciling, construction and certification of land boundary plans in ADEN/ Rajahmundry, Samalkot, Tuni sub-division in Sr.DEN/North/BZA jurisdiction.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.03.North.2015 27-04-2015 Vijayawada-Visakhapatnam section-Repairs to low cess, side slopes, sub banks trolley refugees of existing bank on both up & down lines bet Pulla-Hamsavaram stations of SSEs/P.Way/Rajahmundry, Samalkot, Tuni and Anakapalli sections in ADEN/Rajahmundry, Samalkot, & TUNI Sub-divisions in Sr.DEN/North/BZA.
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.04.North.2015 27-04-2015 SW - I : NIDADAVOLU : Repairs to roof slabs of staff quarters, broken drop walls, stair case walls, dropped ceilings, pealed off plasterings, colony drains and damaged sanitary fittings in staff colony. SW-II: NIDADAVOLU: Repairs to roof slabs of station building, Circulating area, Greenery and brightening to exterior and interior surface in view of Godavari Pushkaram - 2015. SW-III: RAJAHMUNDRY, GODAVARI & KOVVUR: Provision of Hydrant pipe line and carriage watering arrangement for Godavari Pushkaram - 2015. SW-IV: ADEN/SLO Sub division - Repairs to approach road to bye pass cabin from L.C.No.1 (Branch line between SLO-SVPM).
 
Document Available
VijayawadaEngineering BZADRM.Works.BZA.03.2015 dt.23-03-2015 â?? T.No.10.East.2015 27-04-2015 Vijayawada Division:SW-I:Krishna Canal-Vijayawada section: Down line(Westline):Removal/ laying and refixing of existing guard rail, Bridge No.3=1000RM.SW-II:Vijayawada-Supplying of Elastomeric pads for steel sleepers1)KrishnaCanal-Vijayawada section: Down line (West line, Br.No.3=1778Nos, Br.No.4=144Nos Total=1922 ( Nos).SW-III:Vijayawada-Removal/laying and refixing of existing guard rail 1)Vijayawada-Gunadala Down line ,Br.No.7=200RM 2)Vijayawada-Gunadala Up line Br.No.7=200RM(Total 400RM).SW-IV:Vijayawada-Supplying and fixing of 25/30mm thick Elastomeric pads Br.No.3&7, Down line 1906Nos.SW-V:Vijayawada-Supplying and fixing of 25/30mm thick Elastomeric pads1)KrishnaCanalâ??Vijayawada Up line Br.No.3-1741Nos 2)Vijayawada-Gunadala Up line Br.No.7=169Nos (Total =1910 Nos).
 
Document Available
Workshops/ Loco ShedsElectrical dept. CarriageWorkshops LalagudaLGD/L/10/2014-15/OT 28-04-2015 Conversion of WFCs into Inspection Carriage for CAO/SC .(Electrical Works)
 
Document Available
Head QuartersStores HQ82/15-16/LP/BZA 28-04-2015 supply of Drugs, other Medical Store and Surgical items
 

HyderabadSignal & Telecom HYBY/SG/36/2015-16/01 28-04-2015 Provision of surveillance system on hiring basis in connection with Godavari Pushkaram at BSX for a period of 18 days.
 
Document Available
Construction OrganisationElectrical Works Construction HQ25/2014-2015/E(GS)/CN 28-04-2015 Bidar - Gulbarga New BG Line Project: Electrification of Station Building, Platform, RBGE Room, FOB, COP, Circulating area & approach road lighting with HT/LT power supply arrangements at Hallikhed K, Kallur Road and Marugotti Railway Stations including balance and Residual works in the section of Humnabad -Marugotti. & Provision for Providing Second cable to 5Nos of LT Power line Modified crossings of GESCOM authorities (at Km No.10/300-400, 11/100-200, 12/400-500, 17/200-300 & 36/700-800) in the section of Bidar - Humnabad.
 
Document Available
1 - 20  Of  (213)                 1   2   3   4   5   6   7   8   9   10   11   Next   Last



  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.